Copper Core PVC Insulated SWA Steel Wire Armoured Underground Control Cable
Application
Used as an interconnecting cable in signal and control equipment - for measuring, control or regulation
Technical data
Rated voltage: 450/750V
The Highest working temperature of conductor :90°C
The temperature for laying cable : not less than 0 °C
The bending radius : unarmoured cable , it should be not less than 8 times of diameter ; armoured or copper
tape shield cable,it should not be less than 12 times of diameter.
Applications |
|
Used as an interconnecting cable in signal and control equipment - for measuring, control or regulation. |
Standards |
|
GB/T9330-2008 |
|
Using Features |
|
The highest working temperature of conductor is 70oC |
The temperature fot laying cable should be not less than 0oC |
The bending radius of the cable:unarmoured cable,should be not less than 8times of diameter;armoured or copper tape shield cable,should not be less |
than 12times of diameter. |
Product description
Model No. |
Product Name |
KVV |
Copper conductor PVC insulation PVC sheath control cable |
KVVP |
Copper conductor PVC insulation copper wire braid shield PVC sheath control cable |
KVVP2 |
Copper conductor PVC insulation copper tape shield PVC sheath control cable |
KVVP3 |
Copper conductor PVC insulation Al-foil shield PVC sheath control cable |
KVV22 |
Copper conductor PVC insulation steel tape armouring PVC sheath control cable |
KVVP2-22 |
Copper conductor PVC insulation copper tape shield steel tape armouring PVC sheath control cable |
KVV32 |
Copper conductor PVC insulation steel wire armouring PVC sheath control cable |
KVVR |
Flexible copper conductor PVC insulation PVC sheath control cable |
KVVRP |
Flexible copper conductor PVC insulation copper wire braid shield PVC sheath control cable |
ZR-KVV |
Copper conductor PVC insulation PVC sheath control cable, flame retardant |
ZR-KVVP |
Copper conductor PVC insulation copper wire braid shield PVC sheath control cable, flame retardant |
ZR-KVVP2 |
Copper conductor PVC insulation copper tape shield PVC sheath control cable, flame retardant |
ZR-KVVP3 |
Copper conductor PVC insulation Al-foil shield PVC sheath control cable, flame retardant |
ZR-KVV22 |
Copper conductor PVC insulation steel tape armouring PVC sheath control cable, flame retardant |
ZR-KVVP2-22 |
Copper conductor PVC insulation copper tape shield steel tape armouring PVC sheath control cable, flame retardant |
ZR-KVV32 |
Copper conductor PVC insulation steel wire armouring PVC sheath control cable, flame retardant |
ZR-KVVR |
Flexible copper conductor PVC insulation PVC sheath control cable, flame retardant |
ZR-KVVRP |
Flexible copper conductor PVC insulation copper wire braid shield PVC sheath control cable, flame retardant |
Our company
Yifang Electric group mainly specialized in wire&cables,including designment,production and sale.
Products are mainly covering low,medium,high voltage(1KV to 220KV) XLPE Insulated power cable,PVC insulated power cable,ABC cable,building cable control cable,rubber cable welding cable Etc.
Our XLPE cable can be manufactured according to the company's specification which is equivalent to IEC 60502,IEC60332,IEC60754. Some indexes are superior to above international standard.
Our certificate
FAQ
1.Q:Are you a factory or trading company?
A: Manufacturing base in Henan ,China, with more than 500 workers.
2.Q:How can I visit there?
A: Sure,If you need,we will arrange the driver to pick you up.
3.Q:How can I get some samples?
A: Contact me on below,Determin sample and address for shipping.
4.Q:Have you ever supplied cables to our country?
A: Yifang Cables have been sold to over 100 countries and regions in the world. can you contact me for details.
5.Q:What is your MOQ?
A: MOQ Normally 500 meters for big diameter cables.Please contact me for detail info if you have specific cable requirement.
6. Q:When can I get the price?
A: Usually quote within 6 hours after we get your inquiry.
7.Q:How long is your delivery time?
A: According to your order's quantity.Usually our lead time is 3 - 20 working days.