1. The products are mainly complying with iec 60502 standard, also can be produced according to OEM requirements and other standards, such as bs standard, DIN standard, ASTM standard, etc.
Voltage grade is up to 35kv, cross-section area can be up to 400 sqmm (copper or aluminiun conductor). Conductor long-time operating temperature is 90 degrees. In short circuit, conductor highest temperature should be not more than 250 degrees.
2. Brief Construction:
Single core or multi-core
Copper or aluminium conductor
XLPE insulation
Copper tape or copper wire screen
Galvanized steel wire armored
PVC or PE sheath
3. Laying conditions: For lyaing under ground with large different altitude, be able to bear external machanical force and moderate pulling force
4. Package
5.Our company
Yifang Electric group mainly specialized in wire&cables,including designment,production and sale.
Products are mainly covering low,medium,high voltage(1KV to 220KV) XLPE Insulated power cable,PVC insulated power cable,ABC cable,building cable control cable,rubber cable welding cable Etc.
Our XLPE cable can be manufactured according to the company's specification which is equivalent to IEC 60502,IEC60332,IEC60754. Some indexes are superior to above international standard.
6.Our certificate
7.FAQ
1.Q:Are you a factory or trading company?
A: Manufacturing base in Henan ,China, with more than 500 workers.
2.Q:How can I visit there?
A: Sure,If you need,we will arrange the driver to pick you up.
3.Q:How can I get some samples?
A: Contact me on below,Determin sample and address for shipping.
4.Q:Have you ever supplied cables to our country?
A: Yifang Cables have been sold to over 100 countries and regions in the world. can you contact me for details.
5.Q:What is your MOQ?
A: MOQ Normally 500 meters for big diameter cables.Please contact me for detail info if you have specific cable requirement.
6. Q:When can I get the price?
A: Usually quote within 6 hours after we get your inquiry.
7.Q:How long is your delivery time?
A: According to your order's quantity.Usually our lead time is 3 - 20 working days.