Full neutral, Reduced Neutral 1/3 Neutral, MV Concentric Cable
1. The cable belongs to XLPE Insulated single core, concentric neutral cables rated 5 to 45KV which are used for the transmission and electrical energy, distribution of electrical energy.
2. Reference Standard: ICEA S-94-649, CSA C68.5, IEC60502.
3. Cable construction
3.1 Conductor: Stranded Compacted Copper or Aluminium Wire, Class B
3.2 Conductor shield: Semi-conductor XLPE Compound
3.3 Insulation: XLPE or TRXLPE
3.4 Insulation shield: Semi-conductor XLPE Compound
3.5 Concentric neutral wire: Round Annealed Copper Wire, Full neutral or Reduced neutral
3.6 Wrapping tape(optional): Non-woven clothing tape
3.7 Outer sheath: PVC/LDPE/LLDPE/HDPE
4. Packing: Roll/Wooden drum/Iron-wooden drum/ Steel drum
Our company
Yifang Electric group mainly specialized in wire&cables,including designment,production and sale.
Products are mainly covering low,medium,high voltage(1KV to 220KV) XLPE Insulated power cable,PVC insulated power cable,ABC cable,building cable control cable,rubber cable welding cable Etc.
Our XLPE cable can be manufactured according to the company's specification which is equivalent to IEC 60502,IEC60332,IEC60754. Some indexes are superior to above international standard.
Our certificate
FAQ
1.Q:Are you a factory or trading company?
A: Manufacturing base in Henan ,China, with more than 500 workers.
2.Q:How can I visit there?
A: Sure,If you need,we will arrange the driver to pick you up.
3.Q:How can I get some samples?
A: Contact me on below,Determin sample and address for shipping.
4.Q:Have you ever supplied cables to our country?
A: Yifang Cables have been sold to over 100 countries and regions in the world. can you contact me for details.
5.Q:What is your MOQ?
A: MOQ Normally 500 meters for big diameter cables.Please contact me for detail info if you have specific cable requirement.
6. Q:When can I get the price?
A: Usually quote within 6 hours after we get your inquiry.
7.Q:How long is your delivery time?
A: According to your order's quantity.Usually our lead time is 3 - 20 working days.