Guide for The Installation of ACSR Twisted Pair (TP) Conductor

Product Details
Customization: Available
Type: Bare
Conductor Type: Stranded
Still deciding? Get samples of US$ 0.01/Meter
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2009

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
to see all verified strength labels (29)
  • Guide for The Installation of ACSR Twisted Pair (TP) Conductor
  • Guide for The Installation of ACSR Twisted Pair (TP) Conductor
  • Guide for The Installation of ACSR Twisted Pair (TP) Conductor
  • Guide for The Installation of ACSR Twisted Pair (TP) Conductor
  • Guide for The Installation of ACSR Twisted Pair (TP) Conductor
  • Guide for The Installation of ACSR Twisted Pair (TP) Conductor
Find Similar Products

Basic Info.

Model NO.
(TP) Conductor
Conductor Material
Aluminum
Material Shape
Round Wire
Certification
ISO9001, CE, CCC
Transport Package
Drum, Reel or According to Your Request
Specification
IEC, BS, DIN, ASTM, JIS, GOST, ETC
Trademark
Yifang
Origin
China
HS Code
7614900000
Production Capacity
500, 000km Per Month

Product Description

Overview
ACSR/TP overhead conductor consists of two standard concentric stranded ACSR conductors twisted around each other. It may be installed using techniques and equipment similar to that used to install other concentric round wire conductors. However, a few special procedures must be used to maintain equal tension between the two component conductors. The equipment recommendations and special procedures in this guide along with recommendations given in IEEE Std. 524, "Guide to the Installation of overhead Transmission Line Conductors", should be followed.

Handling
It is important to maintain the relationship of the conductor lengths established during manufacturing. Therefore, ACSR/TP conductor should not be rewound in the field from the shipping reel to another reel. Reels containing ACSR/TP conductor should be stored upright, resting on the rims. Never lay the reel on its side.

Tensioners & Sheaves
Most methods of installation used for standard round conductor can be used to install ACSR/TP conductor. However, non-tension methods of stringing are preferred such as laying the conductor out on the ground and then lifting it into position on the poles.

If the conductor must be strung under tension then a multi-groove bullwheel tensioner MUST be used to install ACSR/TP conductor. A tensioner in which the alignment of the front and back bullwheels are offset by ½ the groove spacing is satisfactory for installing smaller sizes of ACSR/TP conductor, where the conductor will lay flat in the bottom on the groove. If improper equipment is used, the ridge between the grooves may separate the individual ACSR/TP conductors.

Another commonly used tensioner has one bullwheel tilted slightly in relation to the other. This allows the conductor to ride in the bottom of the grooves. This type of tensioner, when properly sized, is preferred.

The bottom groove diameters for sheaves and bullwheels should be sized in accordance with IEEE Std. 524; except that the bottom groove for sheaves should not be less than 14 times the maximum diameter of the ACSR/TP conductor. Note that for this type of conductor the term "Dc" should be twice the diameter of one component conductor (referred to in this guide as the 'maximum diameter').

The groove radius of the sheave and bullwheel must be wide enough to allow the ACSR/ TP conductor to pass through with the two individual conductors laying flat and parallel. The minimum groove radius should be 0.55 times the maximum diameter of the ACSR/ TP conductor. The use of smaller than recommended diameter sheaves and/or high stringing tensions may cause a build-up of torsional stress into the conductor.

Stringing
Each shipping length of ACSR/TP conductor has three metal bands applied at the factory around both conductors, one band at each end and one approximately 10 feet from the leading end. It is recommended that these bands not be removed for the stringing procedure, however, if the gripping device cannot be applied, then it is acceptable to remove the outer band only leaving the second band in place a few feet further up the conductor. These bands will help maintain the individual conductor length relationship when splicing and deadending.

A single woven wire grip sized to fit over both conductors and a swivel link should be used for tension stringing. Double band the open end of the grip to prevent it from accidentally coming off. Apply tape over the bands to protect the stringing sheave surface.

Tensioning
ACSR/TP conductor should be tensioned by placing a separate grip on each component conductor. The two grips are connected through a snatch block with a sling. Tension is applied to the snatch block with a hoist or other appropriate tensioning device.  This arrangement will apply even tension to the component conductors.

Splicing
ACSR/TP conductors are normally joined by separately splicing each component conductor. Where possible, the individual conductor splices  should be staggered about 5 feet. An additional twist may be needed before the second splice is made to remove any looseness between the individual conductors. This will ensure that each component conductor carries an even share of line tension. Both splices must be made before tension is applied.

Repairs
Repairs to a damaged component conductor can be made using the following procedure:

  1. Attach two wire grips facing each other approximately 15 feet apart on the undamaged component conductors.
  2. Attach a hoist to the grips and take up tension.  As the tension increases, slack will appear in the damaged conductor.
  3. Increase tension until there is enough slack to make the repairs.

If it is necessary to cut the damaged conductor to install a splice, a second set of grips and hoist must be installed on the damaged conductor before it is cut. The above procedure should be followed to install the grips.

Helically applied rods may also be used for repairs in accordance with normal utility practice given the nature and severity of damage. Follow the above procedures to install the repair rods on the damaged conductor.

Guide for The Installation of ACSR Twisted Pair (TP) ConductorGuide for The Installation of ACSR Twisted Pair (TP) Conductor

Our company

Yifang Electric group mainly specialized in wire&cables,including designment,production and sale.

Products are mainly covering low,medium,high voltage(1KV to 220KV) XLPE Insulated power cable,PVC insulated power cable,ABC cable,building cable control cable,rubber cable welding cable Etc.

Our XLPE cable can be manufactured according to the company's specification which is equivalent to IEC 60502,IEC60332,IEC60754. Some indexes are superior to above international standard.


Guide for The Installation of ACSR Twisted Pair (TP) Conductor
Our certificate

Guide for The Installation of ACSR Twisted Pair (TP) Conductor

FAQ
1.Q:Are you a factory or trading company? 
 A: Manufacturing base in Henan ,China, with more than 500 workers.

2.Q:How can I visit there? 
 A: Sure,If you need,we will arrange the driver to pick you up. 

3.Q:How can I get some samples? 
 A: Contact me on below,Determin sample and address for shipping.  

4.Q:Have you ever supplied cables to our country? 
 A: Yifang Cables have been sold to over 100 countries and regions in the world. can you contact me for details.

5.Q:What is your MOQ? 
A: MOQ Normally 500 meters for big diameter cables.Please contact me for detail info if you have specific cable requirement. 

6. Q:When can I get the price? 
A: Usually quote within 6 hours after we get your inquiry. 

7.Q:How long is your delivery time?
 A: According to your order's quantity.Usually our lead time is 3 - 20 working days.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier