Customization: | Available |
---|---|
Application: | Construction, Underground, Power Station |
Voltage: | Low and Medium Voltage Cable |
Still deciding? Get samples of US$ 0.01/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cable Underground PVC/XLPE SWA
1.Brief of XLPE Insulated Power Cable
Nominal Cross Section mm 2 | Main cores | 2.5 | 4 | 6 | 10 | 16 | 25 | 35 | 50 |
Neutral cores | 1.5 | 2.5 | 4 | 6 | 10 | 16 | 16 | 25 | |
Nominal Cross Section mm 2 | Main cores | 70 | 95 | 120 | 150 | 185 | 240 | 300 | 400 |
Neutral cores | 35 | 50 | 70 | 70 | 95 | 120 | 150 | 185 |
Nominal Cross Section mm 2 | 1.5 | 2.5 | 4 | 6 | 10 | 16 | 25 |
Cu core Ohm/km | 12.1 | 7.41 | 4.61 | 3.08 | 1.83 | 1.15 | 0.727 |
Al core Ohm/km | 18.1 | 12.1 | 7.41 | 4.61 | 3.08 | 1.91 | 1.2 |
Nominal Cross Section mm 2 | 35 | 50 | 70 | 95 | 120 | 150 | 185 |
Cu core Ohm/km | 0.524 | 0.387 | 0.268 | 0.193 | 0.153 | 0.124 | 0.0991 |
Al core Ohm/km | 0.868 | 0.641 | 0.443 | 0.32 | 0.253 | 0.206 | 0.164 |
Nominal Cross Section mm 2 | 240 | 300 | 400 | 500 | 630 | 800 | 1000 |
Cu core Ohm/km | 0.0754 | 0.06 | 0.047 | 0.0366 | 0.0283 | 0.0221 | 0.0176 |
Al core Ohm/km | 0.125 | 0.1 | 0.0778 | 0.0605 | 0.0469 | 0.0367 | 0.0291 |
Yifang Electric Group Inc. mainly specialized in wires&cables, including designment, production and sale.
1.Q:Are you a factory or trading company?
A: Manufacturing base in Henan ,China, with more than 500 workers.
2.Q:How can I visit there?
A: Sure,If you need,we will arrange the driver to pick you up.
3.Q:How can I get some samples?
A: Contact me on below,Determin sample and address for shipping.
4.Q:Have you ever supplied cables to our country?
A: Yifang Cables have been sold to over 100 countries and regions in the world. can you contact me for details.
5.Q:What is your MOQ?
A: MOQ Normally 500 meters for big diameter cables.Please contact me for detail info if you have specific cable requirement.
6. Q:When can I get the price?
A: Usually quote within 6 hours after we get your inquiry.
7.Q:How long is your delivery time?
A: According to your order's quantity.Usually our lead time is 3 - 20 working days.