XLPE insulation overhead cable copper/aluminum condcutor
Applications
To supply 120 volt aerial service for temporary service at construction sites, outdoor or street lighting. For service at 600 volts or lower at a conductor temperature of 75° C maximum.
Construction
Concentric strand or compressed 1350-H19 conductor, polyethylene or cross linked polyethylene insulation, concentric strand AAC, ACSR, or 6201 alloy neutral messenger.
Conductor: Aluminum / Aluminum alloy / copper
Insulation: XLPE / PE / PVC
Rated voltage: 0.6/1kv
Type of Aerial Bundle Cable:
Aerial Bundle Cable covers mainly three types:
Two core(Duplex Service Drop)
Three core(Triplex Service Drop)
Four core(Quadruplex Service Drop)
Standards
IEC BS DIN VDE ASTM, etc
Other special characterisctic:
We can also design and manufacture according to customer's special requirement
Our company
Yifang Electric group mainly specialized in wire&cables,including designment,production and sale.
Products are mainly covering low,medium,high voltage(1KV to 220KV) XLPE Insulated power cable,PVC insulated power cable,ABC cable,building cable control cable,rubber cable welding cable Etc.
Our XLPE cable can be manufactured according to the company's specification which is equivalent to IEC 60502,IEC60332,IEC60754. Some indexes are superior to above international standard.
Our certificate
FAQ
1.Q:Are you a factory or trading company?
A: Manufacturing base in Henan ,China, with more than 500 workers.
2.Q:How can I visit there?
A: Sure,If you need,we will arrange the driver to pick you up.
3.Q:How can I get some samples?
A: Contact me on below,Determin sample and address for shipping.
4.Q:Have you ever supplied cables to our country?
A: Yifang Cables have been sold to over 100 countries and regions in the world. can you contact me for details.
5.Q:What is your MOQ?
A: MOQ Normally 500 meters for big diameter cables.Please contact me for detail info if you have specific cable requirement.
6. Q:When can I get the price?
A: Usually quote within 6 hours after we get your inquiry.
7.Q:How long is your delivery time?
A: According to your order's quantity.Usually our lead time is 3 - 20 working days.